top of page

Production optimisation

Spencer Petroleum Consulting (“SPC”) has significant experience in production optimisation particularly in the following areas: artificial lift (gas lift, rod pumps, ESP’s, plunger lift and velocity strings), optimizing tubing size, perforation gun selection, workover selection/planning and design, missed or behind pipe pay interval evaluation, flowline sizing, choke selection and optimisation, reservoir stimulation (acid washes, acid squeezes, propped and acid fraccing, re-perforating selection and design), dealing with salt and or wax deposition in the well, corrosion affects caused by sour gas. SPC specialises in determining what the technical potential (maximum physical production rate) of a well is and determining both why this is not being achieved and what options are available and most suitable to increase the rate to its maximum. Costs, timeline, equipment source and availability, risks and economics can all be determined for the client giving a clear indication of the profit expectation of each project.

bottom of page